S/N |
PROJECT NAME AND LOCATION |
PROJECT SUM (N) |
MODE OF EXECUTION |
AMOUNT EXPENDED (N) |
IF ROAD PORJECT/ INDICATE LEGNTH AND WIDTH |
PERCNETAGE OF COMPLETION (%) |
DIRECTÂ LABOUR |
CONTRACT |
PARTICULAR OF THE CONTRACTORS |
1.
 |
Rehabilitation of Hydraulic Structure, Earthworks and Asphaltic covering of Pot Holes at Interval of Oge-Ilua Road |
9,735,000.00 |
 |
 |
 |
9,735,000.00 |
 |
Completed |
2. |
Rehabilitation of Hydraulic Structure, Earthworks and Asphaltic covering of Pot Holes at Interval of Boda â Dam Junction |
8,930,000.00 |
 |
 |
 |
8,930,000.00 |
 |
Completed |
3. |
Rehabilitation of Hydraulic Structure, Earthworks and Asphaltic covering of Pot Holes at Interval of Kinnikinni-Baabo Road |
9,050,000.00 |
 |
 |
 |
9,050,000.00 |
L=600M
W=7.3M |
Completed |
4. |
Rehabilitation of Yankan â Abiodun Road |
485,000.00 |
 |
 |
 |
485,000.00 |
 |
Completed |
5. |
Rehabilitation of Yankan â Abiodun Bore Hole |
220,000.00 |
 |
 |
 |
220,000.00 |
 |
Completed |
6. |
Rehabilitation of Baabo Motorised Bore Hole |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
7. |
Clearing and Removal of Deposits in the line Drainage at Along Oke-Opin Road |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
8. |
Reconstruction of failed wing wall, under pining of the Bale of Ayanmogun Culvert at Baabo |
300,000.00 |
 |
 |
 |
300,000.00 |
 |
Completed |
9. |
Construction of 41.5m line Drainage at in front of Ogidigbo Maternity |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
10. |
Extension of Building at Adabo Primary Health Care |
490,000.00 |
 |
 |
 |
490,000.00 |
 |
Completed |
11. |
Construction of 80m retaining wall along Dam Road |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
12. |
Rehabilitation of Isale Oro Bore Hole |
286,000.00 |
 |
 |
 |
286,000.00 |
 |
Completed |
13. |
Rehabilitation of Kinnikinni Bore Hole |
273,000.00 |
 |
 |
 |
273,000.00 |
 |
Completed |
14. |
Rehabilitation of Ajelanwa Bore Hole |
258,000.00 |
 |
 |
 |
258,000.00 |
 |
Completed |
15. |
Rehabilitation of Imua Aarin Bore Hole |
220,000.00 |
 |
 |
 |
220,000.00 |
 |
Completed |
16. |
Rehabilitation of Idera Iwofun Bore Hole |
238,000.00 |
 |
 |
 |
238,000.00 |
 |
Completed |
17. |
Rehabilitation of Onigbongbo Bore Hole |
260,000.00 |
 |
 |
 |
260,000.00 |
 |
Completed |
18. |
Public interaction on forest resources management |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
19. |
Evacuation of debris at Bada Area |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
. |
Clearing of heaps of refuse at Emi Abata |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
60. |
Construction of Rubble Stone Line Drainage at Araromi |
410,000.00 |
 |
 |
 |
410,000.00 |
 |
Completed |
61. |
Supply, Spreading and Grading of Laterite at Onikeke Road |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
62. |
Construction of Rubble Stone Line Drainage at Ayekale |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
63. |
Construction of Line Drainage at Alado Ilua |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
64. |
Construction of Line Drainage at Booda Road |
380,000.00 |
 |
 |
 |
380,000.00 |
 |
Completed |
65. |
Construction of Line Drainage at Abida Street |
395,000.00 |
 |
 |
 |
395,000.00 |
 |
Completed |
66. |
Construction of Line Drainage at Balogun Road |
390,000.00 |
 |
 |
 |
390,000.00 |
 |
Completed |
67. |
Clearing of heaps of refuse at Ayekale |
200,000.00 |
 |
 |
 |
200,000.00 |
 |
Completed |
68. |
Rehabilitation of Ajelanwa Bore Hole |
258,000.00 |
 |
 |
 |
250,000.00 |
 |
Completed |
69. |
Rehabilitation of Imua Aarin Bore Hole |
220,000.00 |
 |
 |
 |
220,000.00 |
 |
Completed |
70. |
Rehabilitation of Idera-Iwaofun Bore Hole |
238,000.00 |
 |
 |
 |
238,000.00 |
 |
Completed |
71. |
Rehabilitation of Ogidigbo â Omojaye Bore Hole |
285,000.00 |
 |
 |
 |
285,000.00 |
 |
Completed |
72. |
Rehabilitation of Kinnikinni Bore Hole |
273,000.00 |
 |
 |
 |
273,000.00 |
 |
Completed |
73. |
Rehabilitation of Onigbongbo Bore Hole |
260,000.00 |
 |
 |
 |
260,000.00 |
 |
Completed |
74. |
Evacuation of debris at Baabo Road |
410,000.00 |
 |
 |
 |
410,000.00 |
 |
Completed |
75. |
Evacuation of debris at Oke-Daodu Road |
390,000.00 |
 |
 |
 |
390,000.00 |
 |
Completed |
76. |
Channelization of Drainage at Oge-Ilua |
408,000.00 |
 |
 |
 |
408,000.00 |
 |
Completed |
77. |
Evacuation of illegal refuse dump at Onikeke Road |
394,000.00 |
 |
 |
 |
394,000.00 |
 |
Completed |
78. |
Clearing of Asabari LCDA Permanent Site Kinnikinni |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
Completed |
79. |
Clearing of Asabari LCDA market Along Kooko Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
80. |
Evacuation/Blasting of Rocks within the premises of Asabari LCDA permanent Site Kinnikinni |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
81. |
Purchase of Cat Grader Tyres |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
82. |
Rehabilitation of Asabari Grammar School Road, Ilua |
478,000.00 |
 |
 |
 |
478,000.00 |
 |
Completed |
83. |
Rehabilitation Yambari Alimi Baka Road |
473,000.00 |
 |
 |
 |
473,000.00 |
 |
Completed |
84. |
Rehabilitation of Orisumbare Community Road |
470,000.00 |
 |
 |
 |
470,000.00 |
 |
Completed |
85. |
Rehabilitation of Ilua Community Primary Road |
483,000.00 |
 |
 |
 |
483,000.00 |
 |
Completed |
86. |
Rehabilitation of Agoluabi Road |
490,000.00 |
 |
 |
 |
490,000.00 |
 |
Completed |
85. |
Rehabilitation of Alubarika Community road |
487,000.00 |
 |
 |
 |
487,000.00 |
 |
Completed |
89. |
Clearing and Removal of Deposits in Line Drainage and Culverts Channel along Kinnikinni Road in Asabair LCDA |
478,000.00 |
 |
 |
 |
478,000.00 |
 |
Competed |
90. |
Rehabilitation of Bodilu Road â Iware Road |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
91. |
Rehabilitation of Daouda Opo Road â Oge Road |
490,000.00 |
 |
 |
 |
490,000.00 |
 |
Completed |
92. |
Rehabilitation of Bafan Bamu Road |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
93. |
Rehabilitation of Mustapha Community Road |
490,000.00 |
 |
 |
 |
490,000.00 |
 |
Completed |
94. |
Rehabilitation of Ojo Idera â Igbo Olodan Road (178m) |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
95. |
Rehabilitation of Elegbeda Road â Budo Hausa (178m) |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
96. |
Rehabilitation of Budo Hausa â Togun Road (178m) |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
97. |
Construction of Rubble Stone, Retaining Wall form Imam Akewula to Sangote Road Junction (83m) |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
98. |
Clearing and Removal of Deposit in Lined Drainage and culverts channel Along Ilua Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
99. |
Clearing and Removal of Deposit in Lined Drainage and Culvert channel Along Agoluabi Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
100. |
Rehabilitation of Oke-Odo Area at Kinnikinni Town Hall (178m) |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
Completed |
101. |
Rehabilitation of New Yam Market (178m) |
410,000.00 |
 |
 |
 |
410,000.00 |
 |
Completed |
102. |
Rehabilitation of Road at Baba Isale Area (178m) |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
103. |
Rehabilitation of Road at Butubutu Area (178m) |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
104. |
Rehabilitation of Road at Kajola Area (178m) |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
105. |
Rehabilitation of Road at Ayekale (178m) |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
106. |
Rehabilitation of Road at Jasola Area (178m) |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
107. |
Clearing and Removal of Deposits in Line Drainage and Culvert Channel Along Isale Ola Road |
390,000.00 |
 |
 |
 |
390,000.00 |
 |
Completed |
108. |
Rehabilitation of Araromi Road (178m) |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
109. |
Rehabilitation of Alfa Aleem Eid Praying Ground Road (178m) |
485,000.00 |
 |
 |
 |
485,000.00 |
 |
Completed |
110. |
Evacuation/Blasting of Rocks Along Kajola â Sangote Line Drainage |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
Competed |
111. |
Rehabilitation of Road Odoboo Area (178m) |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
112. |
Rehabilitation of Jariogbe Road (178m) |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
113. |
Rehabilitation of Agoluabi â Foori Road (178m) |
417,000.00 |
 |
 |
 |
417,000.00 |
 |
Completed |
114. |
Rehabilitation of Igbo Ewuro Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
115. |
Rehabilitation of Yankan Abiodun Road |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
116. |
Rehabilitation of Baba Emi Abata Road |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
117. |
Rehabilitation of Jafariyat Comm. Prayer Ground |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
118. |
Rehabilitation of Akande Road |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
119. |
Rehabilitation of Apa-Abe Road |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
120. |
Rehabilitation of Koko Area Road |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
121. |
Rehabilitation of Ilua Garage â Odo Ofiki Cross Culvert |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
122. |
Rehabilitation Of Baba Samson Church Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
123. |
Completion of Hand pump Bore Hole at Egbeda-Oja Area |
490,000.00 |
 |
 |
 |
490,000.00 |
 |
Completed |
124. |
Rehabilation of Baab Maternity Deep well |
200,000.00 |
 |
 |
 |
200,000.00 |
 |
Completed |
125. |
Completion of Hand Pump Bore Hole at Yankan Alade Area |
490,000.00 |
 |
 |
 |
490,000.00 |
 |
Completed |
126. |
Completion of Hand Pump Bore Hole Orita Sanni Area |
490,000.00 |
 |
 |
 |
490,000.00 |
 |
Completed |
127. |
Extension of Sangote Water Scheme |
250,000.00 |
 |
 |
 |
250,000.00 |
 |
Completed |
128. |
Evacuation of refuse dump at Owode |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
129. |
Removal of debris at Sangote/Baabo |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
130. |
Sanitary clearing of Illegal dumping site at Kulate |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Competed |
131. |
Rehabilitation of Gbepakan II Bore Hole |
260,000.00 |
 |
 |
 |
260,000.00 |
 |
Completed |
132. |
Rehabilitation of Sanni-Sala II Bore Hole |
227,000.00 |
 |
 |
 |
227,000.00 |
 |
Completed |
133. |
Rehabilitation of Owode Pira Bore Hole |
226,000.00 |
 |
 |
 |
226,000.00 |
 |
Completed |
134. |
Installation of India Mark III Hand Pump at Yemere Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
135. |
Supply, Spreading and Grading of Laterite at Oge Area |
380,000.00 |
 |
 |
 |
380,000.00 |
 |
Completed |
136. |
Supply, Spreading and Grading of Laterite at Apa Abe Area |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
137. |
Construction/Installation of DC outdoor Sola street light at Sangote Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
138 |
Construction/Installation of DC outdoor Sola street light at Gbepakan Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
139. |
Construction/Installation of DC outdoor Sola street light at Imua Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
140. |
Construction/Installation of DC outdoor Sola street light at Orita Sanni Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
141. |
Construction/Installation of DC outdoor Sola street light at Onigbongbo Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
142. |
Construction/Installation of DC outdoor Sola street light at Sanni-Sala Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
143. |
Construction/Installation of DC outdoor Sola street light at Ekokan Area |
480,000.00 |
 |
 |
 |
480,000.00 |
 |
Completed |
145. |
Supply, Spreading and Grading of Laterite at Boda/Orisunbare Road |
410,000.00 |
 |
 |
 |
410,000.00 |
 |
Competed |
146. |
Supply, Spreading and Grading of Laterite at Baba Samson Area |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
Completed |
147. |
Supply, Spreading and Grading of Laterite at Aladura/Egbeda Area |
300,000.00 |
 |
 |
 |
300,000.00 |
 |
Completed |
148. |
Supply, Spreading and Grading of Laterite at Isere |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
Completed |
149. |
Septic Removal of debris at Ayetoro |
350,000.00 |
 |
 |
 |
350,000.00 |
 |
Completed |
150. |
Construction of Deep Well at Yankan Baba Dudu, Osee and Odobo Village |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
Completed |
151. |
Construction of Deep Well at Boodilu and Ajelanwa |
280,000.00 |
 |
 |
 |
280,000.00 |
 |
Completed |
152. |
Construction of Deep Well at Gbepakan Gaa Fulani and Budo Jimoh Fulani |
280,000.00 |
 |
 |
 |
280,000.00 |
 |
Completed |
153. |
Construction of Deep Well at Yemere and Sabi Yanku |
280,000.00 |
 |
 |
 |
2800,000.00 |
 |
Completed |
154. |
Construction of Deep Well at Gaa Eja and Foori Akori Village |
280,000.00 |
 |
 |
 |
2800,000.00 |
 |
Completed |
155. |
Construction of Deep Well at Onikeke Alaje and Ita beese Abojututu Area |
280,000.00 |
 |
 |
 |
2800,000.00 |
 |
Completed |
156. |
Construction of Deep Well at Wasangari Oja |
140,000.00 |
 |
 |
 |
140,000.00 |
 |
Completed |
157. |
Construction of Deep Well at Moojo |
140,000.00 |
 |
 |
 |
140,000.00 |
 |
Completed |
158. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Interval of Omo Ade |
140,000.00 |
 |
 |
 |
140,000.00 |
 |
Completed |
159. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Idi Ape Street |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
160. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Oke Opin Road |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
161. |
Rehabilitation of 81m Rubble Stone Retaining Wall at Keli Ile Street |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
Completed |
162. |
Rehabilitation of 832m Rubble Stone Retaining Wall Abiola Way |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
163. |
Rehabilitation of 80m Rubble Stone Retaining Wall at Ajani Muda Way |
430,000.00 |
 |
 |
 |
430,000.00 |
 |
Completed |
154. |
Rehabilitation of 80m Rubble Stone Retaining Wall at Agoluabi Road |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
Completed |
155. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Pasapa Street |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
156. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Ita Abesin Street |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
Completed |
157. |
Rehabilitation of 880m Rubble Stone Retaining Wall at Isere Street |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
158. |
Rehabilitation of 81m Rubble Stone Retaining Wall at Baabo Street |
470,000.00 |
 |
 |
 |
470,000.00 |
 |
Completed |
159. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Kinnikinni Road |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
Completed |
160. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Sakitoro Street |
470,000.00 |
 |
 |
 |
470,000.00 |
 |
Completed |
161. |
Rehabilitation of 80m Rubble Stone Retaining Wall at Ilua Road |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
Completed |
162. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Ayekale Road |
470,000.00 |
 |
 |
 |
470,000.00 |
 |
Completed |
163. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Bakoja Street |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
164. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Apa Abe Street |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
165. |
Extension of three (3) phase and Neutral at Agoluabi |
370,000.00 |
 |
 |
 |
370,000.00 |
 |
Completed |
166. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Interval of Amule Street |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
167. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Sangote Street |
410,000.00 |
 |
 |
 |
410,000.00 |
 |
Completed |
168. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Ogidigbo Road |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
169. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Isale Oro Road |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
Completed |
170. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Oke Oge Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
171. |
Rehabilitation of 82m Rubble Stone Retaining Wall at Booda Street |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
172. |
Generator and water reticulation at Sakitoro |
435,000.00 |
 |
 |
 |
435,000.00 |
 |
Completed |
173. |
Rehabilitation of Bore Hole at Ayekale |
227,000.00 |
 |
 |
 |
227,000.00 |
 |
Completed |
174. |
Installation of India mark III Hand Pump at Isale Oja Aladura Area |
422,000.00 |
 |
 |
 |
422,000.00 |
 |
Completed |
175. |
Construction of Box culvert at Bada Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
176. |
Rehabilitation of 80m Rubble Stone Retaining Wall at Interval of Onikeke Road |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
Completed |
177. |
Rehabilitation of Potholes with stone base Along Isale Onikeke Road |
300,000.00 |
 |
 |
 |
300,000.00 |
 |
Completed |
178. |
Construction of Deep Well at Kosalapata and Yankan Alade Village |
280,000.00 |
 |
 |
 |
280,000.00 |
 |
Completed |
179. |
Supply, Spreading and Grading of Laterite at Kinnikinni |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
180. |
Supply, Spreading and Grading of Laterite at Agoluabi |
470,000.00 |
 |
 |
 |
470,000.00 |
 |
Completed |
181. |
Supply, Spreading and Grading of Laterite at Gboro Yidi Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
182. |
Supply, Spreading and Grading of Laterite at Ayekale |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
Completed |
183. |
Rehabilitation of 80m Rubble Stone Retain Wall at Aladura Street |
390,000.00 |
 |
 |
 |
390,000.00 |
 |
Completed |
184. |
Rehabilitation of 82m Rubble Stone Retain Wall at Kosalapata Street |
430,000.00 |
 |
 |
 |
430,000.00 |
 |
Completed |
185. |
Rehabilitation of 81m Rubble Stone Retain Wall at Araromi Street |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
186. |
Rehabilitation of 82m Rubble Stone Retain Wall at Tona Road |
470,000.00 |
 |
 |
 |
470,000.00 |
 |
Completed |
187. |
Supply, Spreading and Grading of Laterite at Baabo |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
Completed |
189. |
Construction of Deep Well at Agbo Village |
140,000.00 |
 |
 |
 |
140,000.00 |
 |
Completed |
190. |
Construction of Deep Well at Ajelanwa and Odo Igbo |
280,000.00 |
 |
 |
 |
280,000.00 |
 |
Completed |
191. |
Rehabilitation of 80m Rubble Stone Retaining Wall at Balogun Way |
430,000.00 |
 |
 |
 |
430,000.00 |
 |
Completed |
193. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Ofeefe Street |
390,000.00 |
 |
 |
 |
390,000.00 |
 |
Completed |
194. |
Rehabilitation of 83m Rubble Stone Retaining Wall at Oge Road |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
Completed |
195. |
Rehabilitation of Juju-Sanisala |
4,601,100.00 |
Direct Labour |
Nil |
 |
1,840,440.00 |
L-6.2km
W=10.0m |
40% |
196. |
Rehabilitation of Gbepankan-Juju Road |
3,675,000.00 |
Direct Labour |
- |
- |
1,470,000.00 |
L=4.0km
W=10.0m |
40% |
197. |
Rehabilitation of Ekokan-Mua Road |
5,655,300.00 |
Direct Labour |
- |
- |
2,262,120.00 |
L=5.0km
W=10.0m |
40% |
198. |
Rehabilitation of Mua-Adisa Road |
5,956,020.00 |
Direct Labour |
- |
- |
2,382,408.00 |
L=6.0km
W=10.0m |
40% |
199. |
Fencing of the permanent site, Asabari LCDA, Kinnikinni Phase 1 |
9,939,373.50 |
Direct Labour |
Ni |
Nil |
9,939,373.50 |
Nil |
Completed |
200. |
Iron gate and security house of the permanent Site Phase 2 |
8,757,220.50 |
Direct Labour |
- |
- |
8,757,220.50 |
Nil |
Completed |
201. |
Rehabilitation of Akande Road |
480,000.00 |
Direct Labour |
- |
- |
480,000.00 |
- |
Completed |
202. |
Rehabilitation of Apa Abe Road |
480,000.00 |
Direct Labour |
- |
- |
480,000.00 |
- |
Completed |
203. |
Rehabilitation of Koko Area Road |
480,000.00 |
 |
- |
- |
480,000.00 |
- |
Completed |
204. |
Rehabilitation of Yakan Abiodun Road |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
205. |
Rehabilitation Baba Emi Abata Road |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
206. |
Rehabilitation of Jafariyat prayer Ground Road |
480,000.00 |
               |
 |
 |
480,000.00 |
- |
Completed |
207. |
Rehabilitation of Budo Hausa Road |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
208. |
Clearing and removal of deposit culverts along Araromi |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
209. |
Clearing and removal of deposit culverts along Baabo Road |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
210. |
Clearing and removal of deposit culverts along Basapa Road |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
211. |
Rehabilitation of hydraulic at Sangote-Kajola Road |
3,960,000.00 |
 |
 |
 |
3,960,000.00 |
- |
Completed |
212. |
Health mobilization on indiscriminate disposal of sewage at Yakan Village |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
213. |
Enlightenment on Environmental Hygiene at Idera |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
214. |
Clearing and removal of deposit along Elepo-Oge Road |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
215. |
Rehabilitation of Ilua Garage-Odo Ofiki |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
216. |
Rehabilitation of Baba Samson Church Road |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
217. |
Evacuation of dumping site at Egbeda |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
218. |
Chlorination of well at Bodilu |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
219. |
Small scale poutry |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
220. |
Disposal of sewage water at Foori |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
221. |
Construction of additional Box Culvert at Ilua |
1,448,685.00 |
 |
 |
 |
1,448,685.00 |
- |
Completed |
222. |
Completion of hand pulps borehole at Yankan |
490,000.00 |
 |
 |
 |
490,000.00 |
- |
Completed |
223. |
Rehabilitation of Baabo maternity deep well |
200,000.00 |
 |
 |
 |
200,000.00 |
- |
Completed |
224. |
Completion of hand pump bore hole at Egbeda Oja |
490,000.00 |
 |
 |
 |
490,000.00 |
- |
Completed |
225. |
Rehabilitation of Juju-Sannisala road |
1,840,440.00 |
 |
 |
 |
1,840,440.00 |
- |
Completed |
226. |
Rehabilitation of Gbepakan- Juju Road |
1,470,000.00 |
 |
 |
 |
1,470,000.00 |
- |
Completed |
227. |
Rehabilitation of Mua-Adisa Road |
2,382,408.00 |
 |
 |
 |
2,382,408.00 |
- |
Completed |
228. |
Rehabilitation of Ekokan to Mua Road |
2,262,120.00 |
 |
 |
 |
2,262,120.00 |
- |
Completed |
229. |
Rehabilitation of hydraulic structure |
3,980,000.00 |
 |
 |
 |
3,980,000.00 |
- |
Completed |
230. |
Rehabilitation of hydraulic structure |
3,385,000.00 |
 |
 |
 |
3,385,000.00 |
- |
Completed |
231. |
Evacuation of accumulated heap of refuse at Orita |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
232. |
Clearing of heaps of refuse at Koko |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
233. |
Security surveillance to protect our people from the activities of the men of the world |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
234. |
Septic removal of Debris form River Bank at Yankan Alade |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
235. |
Purchase of one(1) fairly used Toyota Corolla car 2013 model |
3,800,000.00 |
 |
 |
 |
3,800,000.00 |
- |
Completed |
236. |
Rehabilitation of Ogidigbo Road |
2,985,000.00 |
 |
 |
 |
2,985,000.00 |
- |
Completed |
237. |
Campaign against genital mutilation in female |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
238. |
First round training in breast feeding to mothers in Ayekale and Kinnikinni communites |
380,000.00 |
 |
 |
 |
380,000.00 |
- |
Completed |
239. |
2nd round training on breast feedin to mother child bearing age and pregnancy mother in Ogidigbo and Adabo communities |
350,000.00 |
 |
 |
 |
350,000.00 |
- |
Completed |
240. |
Evacuation of refuse dumps at Oke-Opin Area |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
241. |
Clearing of illegal dumping site at Agolasa |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
242. |
Rehabilitation of Owode Pria borehole |
226,000.00 |
 |
 |
 |
226,000.00 |
- |
Completed |
243. |
Installation of India Mark III hand pump at Yemere |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
244. |
Rehabilitation of Sannisala II borehole |
227,000.00 |
 |
 |
 |
227,000.00 |
- |
Completed |
245. |
Rehabilitation of Gbepakan II borehole |
260,000.00 |
 |
 |
 |
260,000.00 |
- |
Completed |
246. |
Supply of laterite at Isere Area |
400,000.00 |
 |
 |
 |
400,000.00 |
- |
Completed |
247. |
Supply of laterite at Oge Area |
380,000.00 |
 |
 |
 |
380,000.00 |
- |
Completed |
248. |
Supply of laterite at egbeda Area |
380,000.00 |
 |
 |
 |
380,000.00 |
- |
Completed |
249. |
Supply of laterite at Orisunmibare Road |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
250. |
Supply of laterite at Apaabe Area |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
251. |
Supply of laterite at Baabo Area |
300,000.00 |
 |
 |
 |
300,000.00 |
- |
Completed |
252. |
Installation of street light at Sangote |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
253. |
Installation of street light at Imua |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
254. |
Installation of street light at Sannisala |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
255. |
Installation of street light at Onigbogbo |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
256. |
Installation of street light at Orita Sanni |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
257. |
Installation of street light at Okerete |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
258. |
Installation of street light at Ekokan |
480,000.00 |
 |
 |
 |
480,000.00 |
- |
Completed |
259. |
Construction of deep well at Budo Jimo |
280,000.00 |
 |
 |
 |
280,000.00 |
- |
Completed |
260. |
Construction of deep well at Baba Dudu Village |
420,000.00 |
 |
 |
 |
420,000.00 |
- |
Completed |
261. |
Construction of deep well at Ajelanwa |
280,000.00 |
 |
 |
 |
280,000.00 |
- |
Completed |
262. |
Construction of deep well at Alase Area |
280,000.00 |
 |
 |
 |
280,000.00 |
- |
Completed |
263. |
Construction of deep well at Yankan |
280,000.00 |
 |
 |
 |
280,000.00 |
- |
Completed |
264. |
Construction of deep well at Oja Idera |
280,000.00 |
 |
 |
 |
280,000.00 |
- |
Completed |
265. |
Construction of deep well at Wasangari |
140,000.00 |
 |
 |
 |
140,000.00 |
- |
Completed |
276. |
Procurement of new Bajaj Motorcycle |
 |
 |
 |
 |
275,000.00 |
- |
Completed |
267. |
Topographical survey |
245,000.00 |
 |
 |
 |
245,000.00 |
- |
Completed |
268. |
Sanitary disposal of debris |
440,000.00 |
 |
 |
 |
440,000.00 |
- |
Completed |
269. |
Septic Removal of Debris |
420,000.00 |
 |
 |
 |
420,000.00 |
- |
Completed |
270. |
Evacuation of refuse dumps |
460,000.00 |
 |
 |
 |
460,000.00 |
- |
Completed |
271. |
Dislodging of garbage at Sanni Area |
450,000.00 |
 |
 |
 |
450,000.00 |
- |
Completed |
272. |
Rehabilitation of rubble stone retaining wall |
460,000.00 |
 |
 |
 |
460,000.00 |
82m |
Completed |
273. |
Rehabilitation of rubble stone retaining wall at Abiola Way |
450,000.00 |
 |
 |
 |
450,000.00 |
83m |
 |
274. |
Rehabilitation of rubble stone retaining wall at Idi ape |
460,000.00 |
 |
 |
 |
360,000.00 |
83m |
 |
275. |
Rehabilitation of rubble stone retaining wall at Keli Ile |
440,000.00 |
 |
 |
 |
440,000.00 |
81m |
 |
276. |
Rehabilitation of rubble stone retaining wall at Ajani Muda Way |
430,000.00 |
 |
 |
 |
430,000.00 |
81m |
 |
277. |
Rehabilitation of rubble stone retaining wall at Ago Oluwabi Road |
440,000.00 |
 |
 |
 |
440,000.00 |
81m |
 |
278. |
Rehabilitation of rubble stone retaining wall at Basapa Street |
460,000.00 |
 |
 |
 |
460,000.00 |
81m |
 |
279. |
Rehabilitation of rubble stone retaining wall at Ita Abesin |
440,000.00 |
 |
 |
 |
440,000.00 |
82m |
 |
280. |
Rehabilitation of rubble stone retaining wall at Isere street |
460,000.00 |
 |
 |
 |
460,000.00 |
80m |
 |
281. |
Rehabilitation of rubble stone retaining wall at Baabo Street |
470,000.00 |
 |
 |
 |
470,000.00 |
81m |
 |
282. |
Rehabilitation of rubble stone retaining wall at Kinnikinni Road |
440,000.00 |
 |
 |
 |
440,000.00 |
83m |
 |
283. |
Rehabilitation of rubble stone retaining wall at Sakitoro |
470,000.00 |
 |
 |
 |
470,000.00 |
82m |
 |
284. |
Rehabilitation of rubble stone retaining wall at Ilua Road |
440,000.00 |
 |
 |
 |
440,000.00 |
82m |
 |
285. |
Rehabilitation of rubble stone retaining wall at Ayekale |
470,000.00 |
 |
 |
 |
470,000.00 |
82m |
 |
286. |
Rehabilitation of rubble stone retaining wall at Bakoja Stree |
460,000.00 |
 |
 |
 |
460,000.00 |
83m |
 |
287. |
Rehabilitation of rubble stone retaining wall at Apa-Abe |
450,000.00 |
 |
 |
 |
450,000.00 |
83m |
 |
288. |
Rehabilitation of rubble stone retaining wall at Omoade |
430,000.00 |
 |
 |
 |
430,000.00 |
83m |
 |
289. |
Construction of deep well |
140,000.00 |
 |
 |
 |
140,000.00 |
 |
 |
290. |
Extension of (3) phase |
370,000.00 |
 |
 |
 |
370,000.00 |
 |
 |
291. |
Rehabilitation of Retaining wall at Amoke |
450,000.00 |
 |
 |
 |
450,000.00 |
83 |
 |
292. |
Rehabilitation at Ogidigbo |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
 |
293. |
Rehabilitation at Oke Oge |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
 |
294. |
Rehabilitation at Sangote |
410,000.00 |
 |
 |
 |
410,000.00 |
 |
 |
295. |
Rehabilitation at Booda |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
 |
296. |
Rehabilitation at Isale Oro |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
 |
297. |
Procurement of Bajaj Motorcycle |
252,000.00 |
 |
 |
 |
252,000.00 |
 |
 |
298. |
Construction of deep well at Kosalapata Area |
280,000.00 |
 |
 |
 |
280,000.00 |
 |
 |
299. |
Rehabilitation of Bore hole at Ayekale |
227,000.00 |
 |
 |
 |
227,000.00 |
 |
 |
300. |
Rehabilitation of Pot Holes Onikeke Road |
300,000.00 |
 |
 |
 |
300,000.00 |
 |
 |
301. |
Retaining Wall at Onikeke Road |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
 |
302. |
Construction box culvert at Bada Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
 |
303. |
Installation of Hand pump machine at Isale Ola |
422,000.00 |
 |
 |
 |
422,000.00 |
 |
 |
304. |
Procurement of Bajaj machine (Agric) |
249,000.00 |
 |
 |
 |
249,000.00 |
 |
 |
305. |
Purchase of 41 acres of Land for Agric |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
 |
306. |
Rehabilitation of Retaining Wall at Balogun Road |
430,000.00 |
 |
 |
 |
430,000.00 |
 |
 |
307. |
Rehabilitation of Retaining Wall at Tola Road |
470,000.00 |
 |
 |
 |
470,000.00 |
 |
 |
308. |
Rehabilitation of Retaining Wall at Araromi Stree |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
 |
309. |
Rehabilitation of Retaining Wall at Kosalapata Street |
430,000.00 |
 |
 |
 |
430,000.00 |
 |
 |
310. |
Rehabilitation of Retaining Wall at Ofefe Street |
390,000.00 |
 |
 |
 |
390,000.00 |
 |
 |
311. |
Rehabilitation of Retaining Wall at Oge Road |
440,000.00 |
 |
 |
 |
440,000.00 |
 |
 |
312. |
Rehabilitation of Retaining Wall Aladura Street |
390,000.00 |
 |
 |
 |
390,000.00 |
 |
 |
313. |
Grading of Road and Laterite at Gbooro Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
 |
314. |
Grading of Road and Laterite Road at Baabo Road |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
 |
315. |
Grading of Road and Laterite Road at Kinnikinni |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
 |
316. |
Grading of Road and Laterite Road at Agoluabi Area |
470,000.00 |
 |
 |
 |
470,000.00 |
 |
 |
317. |
Grading of Road and Laterite Road at Ayekale Area |
460,000.00 |
 |
 |
 |
460,000.00 |
 |
 |
318. |
 Dislodging of garbage at Sinmi Akorode |
430,000.00 |
 |
 |
 |
430,000.00 |
 |
 |
319. |
Evacuation of drainage at Kinnikinni |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
 |
320. |
Clearing of illegal dumped refuse at Awidere Area |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
 |
421. |
Clearing of illegal dumped at Isale-Oro |
450,000.00 |
 |
 |
 |
450,000.00 |
 |
 |
422. |
Construction of deep well at Agboo Village |
140,000.00 |
 |
 |
 |
140,000.00 |
 |
 |
423. |
Construction of deep well at Ajelanwa |
280,000.00 |
 |
 |
 |
280,000.00 |
 |
 |
424. |
Fencing of Secretariat premises |
3,975,749.00 |
 |
 |
 |
3,975,749.00 |
 |
 |
425. |
Construction of temporary shed office for revenue collectors |
110,000.00 |
 |
 |
 |
110,000.00 |
 |
 |
426. |
Procure of LG plastma TV |
330,000.00 |
 |
 |
 |
330,000.00 |
 |
 |
427. |
Procure of standing fan |
335,000.00 |
 |
 |
 |
335,000.00 |
 |
 |
428. |
Mass Chlorination of water |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
 |
429. |
Compensation of Kinnikinni Baptist Church, Saki |
300,000.00 |
 |
 |
 |
300,000.00 |
 |
 |
430. |
Urgent Assistance To Church, Kinnikinni |
200,000.00 |
 |
 |
 |
200,000.00 |
 |
 |
431. |
Rehabilitation of Exam Hall |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
 |
432. |
Fumigation of Baabo Maternity Centre |
350,000.00 |
 |
 |
 |
350,000.00 |
 |
 |
433. |
Fumigation and disinfection of Ilua Maternity Centre |
350,000.00 |
 |
 |
 |
350,000.00 |
 |
 |
434. |
Evacuation of heap of refuse at Ilua Maternity Park |
360,000.00 |
 |
 |
 |
360,000.00 |
 |
 |
435. |
Evacuation of Refuse at Ita-Besin |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
 |
436. |
Box Culvert at Okoko Isale oro |
400,000.00 |
 |
 |
 |
400,000.00 |
 |
 |
437. |
Construction Of Block Wall Fence |
2,627,166.15 |
 |
 |
 |
2,627,166.15 |
 |
 |
438. |
Hosting NEMA & OYSIEC Official |
250,000.00 |
 |
 |
 |
250,000.00 |
 |
 |
439. |
Evacuation of Debris at Bakoja Area |
420,000.00 |
 |
 |
 |
420,000.00 |
 |
 |